Number Block |
Group/Project/Contact/Date |
1-1,999 |
Main Accelerator |
2,000 – 2,999 |
Booster |
3,000 – 4,999 |
Linac |
5,000 – 5,999 |
Radio Frequency |
6,000 – 6,999 |
Beam Transfer |
7,000 – 7,999 |
Experimental Facilities |
8,000 – 11,999 |
Research Equipment |
12,000 – 12,999 |
Beam Transfer |
13,000 – 13,999 |
Physics Research |
14,000 – 16,999 |
Main Accelerator |
17,000 – 18,999 |
Radiation Physics |
19,000 – 20,999 |
Booster |
21,000 – 22,999 |
Radio Frequency |
23,000 – 24,999 |
Beam Transfer |
25,000 – 26,999 |
15 ft. Bubble Chamber |
27,000 – 28,999 |
Technical Services |
29,000 – 29,999
30,000 – 31,999 |
Neutrino Laboratory |
32,000 – 32,999 |
Experimental Facilities |
33,000 – 33,999 |
15 ft. Bubble Chamber |
34,000 – 35,999 |
Accelerator Operations Controls |
36,000 – 37,999 |
Booster |
38,000 – 39,999 |
Meson Laboratory |
40,000 – 41,999 |
30 in. Bubble Chamber |
42,000 – 44,999 |
Proton Laboratory |
45,000 – 47,999 |
Research Services and Physics Department
(H. Barber) |
48,000 – 49,999 |
Internal Target Lab |
50,000 – 51,999 |
Physics Department (Jon Blomquist) |
52,000 – 52,999 |
Meson Laboratory |
53,000 – 54,999 |
Energy Doubler |
55,000 – 59,999 |
Research Services (Ed Scofield) |
60,000 – 61,999 |
Linac (Peggy Crayton) |
62,000 – 63,999 |
Radio Frequency |
64,000 – 67,999 |
Plant Engineering (H. McGreer) |
68,000 – 68,999 |
Cryogenic Energy Storage System (L. Sobocki) |
69,000 – 69,999 |
Accelerator Switchyard (J. Friedl) |
70,000 – 70,999 |
Accelerator Switchyard (Schmitz) |
71,000 – 71,999 |
Tech Services — Magnet Facility (H. Dixon) |
72,000 – 72,999 |
Muon MarkII Dipole Magnets (Art Skraboly) |
73,000 – 79,999 |
Proton (Dee Rae) |
80,000 – 82,000 |
Neutrino Laboratory |
80,000 – 81,999 |
Main Accelerator (L. Sobocki) |
83,000 – 83,999 |
Medical Facility |
84,000 – 85,999 |
Accelerator Division/Mechanical —
Main Ring (Dick Hauser) |
86,000 – 93,999 |
94,000 – 95,999 |
Meson (D. Nelson) |
96,000 – 97,999 |
98,000 – 99,999 |
Tech Services |
100,000 – 101,999 |
102,000 – 102,999 |
Neutrino–Remote Handling Manipulator
(J. Friede) |
103,000 – 103,999 |
Energy Doubler |
104,000 – 105,999 |
Beam Systems (Jim Krebs) |
106,000 – 107,999 |
Energy Doubler (A. Oleck) |
108,000 – 109,999 |
Neutrino (H. Clover) |
110,000 – 110,999 |
Colliding Beam Area (CBA) |
111,000 – 112,999 |
Switchyard Cryo. Equip. & Supercon. Devices (R. Andrews) |
113,000 – 114,999 |
Physics |
115,000 – 116,999 |
Magnet Facility (H. Dixon) |
117,000 – 118,999 |
Tech Services (John Kowalski) |
119,000 – 119,999 |
Accelerator Reverse Injection for Main Ring |
120,000 – 121,999 |
Meson (D. Nelson) |
122,000 – 128,999 |
Energy Doubler/Saver (H. Barber) |
129,000 – 133,999 |
Satellite Refrigerator Support — Accel. Div. – (R. Andrews) |
134,000 – 135,999 |
Colliding Beam Detector–Research Serv.
(M. Atac) |
136,000 – 137,999 |
Energy Doubler Extraction Channel [AØ]
(M. May) |
138,000 – 138,999 |
Energy Doubler Colliding Beam [BØ]
(M. May) |
139,000 – 140,999 |
Energy Doubler Beam Abort [CØ] (M. May) |
141,000 – 141,999 |
Energy Doubler Extraction [DØ] (M. May) |
142,000 – 142,999 |
Energy Doubler Injection [EØ] (M. May) |
143,000 – 143,999 |
Energy Doubler RF [FØ] (M. May) |
144,000 – 144,999 |
Energy Doubler Magnet Measurement
(R. Bossart) |
145,000 – 145,999 |
Tevatron Cryogenics Systems Group
(Nick Augerenos) |
146,000 – 147,999 |
Precooling Ring and pbar Transport (Michelassi) |
148,000 – 148,999 |
Energy Saver Dipole Cordword Production
(A. Oleck) |
155,000 – 155,999 |
Technical Services Central Shops (G. Biallas) |
156,000 -156,999 |
Research Services Cryogenics (L. Mapalo) |
157,000 – 157,999 |
Accelerator Drafting–Energy Saver (D. Bryan) |
158,000 – 159,999 |
Energy Doubler/Saver (Gus Rehbein) |
160,000 – 160,999 |
Energy Saver Magnet Support (Ed Barczak) |
161,000 – 161,999 |
Physics Department (Don Tousignant) |
162,000 – 166,999 |
Neutrino Department (H. Clover) |
167,000 – 168,999 |
Tevatron Cryogenics System Group (H. Barber) |
169,000 – 170,999 |
Pbar source [TeV I] (L. Sobocki) |
171,000 – 171,999 |
Switchyard Cryogenic Components
(Rob Reilly) |
172,000 – 173,999 |
Experimental Area Cryogenics (Norm Cuny) |
174,000 – 175,999 |
Meson Laboratory (D. Nelson) |
176,000 – 176,999 |
Tevatron Magnets (Ed Barczak) |
177,000 – 179,999 |
Const. and Planning Coordination Group [EAD] (D. Johnson) |
180,000 – 182,999 |
RF (Gus Rehbein) |
180,000 – 183,999 |
Central Helium Liquefier (Rick Bossert) |
183,000 – 184,999 |
Research Services Cryogenics (Lee Mapalo) |
185,000 – 186,999 |
Tevatron I Magnets (Ed Barczak) |
187,000 – 189,999 |
Tevatron I–Collider Detector (Don Breyne) |
190,000 – 191,999 |
Tevatron II–Switchyard to Experimental Areas |
192,000 – 192,999 |
Cold Iron Magnets 20 TeV (Ed Barczak) |
193,000 – 194,999 |
Research Services–Cryogenics (Jim Krebs) |
195,000 – 195,999 |
Switchyard Quench Protection System
(Ray Fuja) |
196,000 – 197,999 |
Technical Support (Don Olson) |
198,000 – 198,999 |
Tevatron I [Tooling] (Clare Miller) |
199,000 – 199,999 |
CDF (Mike Neumann) |
200,000 – 200,999 |
3T SSC Magnets (H. Hinterberger) |
201,000 – 203,999 |
Experimental Areas Dept. (Vivian Jacobson) |
204,000 – 204,999 |
CDF (Bob Kephart) |
205,000 – 205,999 |
Advanced Computer Program (Art Cook) |
206,000 – 206,999 |
CDF PIG Group (Tom Wesson) |
207,000 – 207,999 |
Colliding Beam Detectors (Dick Wegforth) |
208,000 – 208,999 |
Antiproton Source TeV I (Larry Sobocki) |
209,000 – 209,999 |
Physics (Carl Lindenmeyer) |
210,000 – 210,999 |
Tevatron I (Jerry Davis) |
211,000 – 211,999 |
Experimental Areas Cryogenics (K. Kaczor) |
212,000 – 212,999 |
SSC Cryostat (Jerry Davis) |
213,000 – 213,999 |
Magnet Measurements (Roger Bossert) |
214,000 – 214,999 |
Bubble Chamber–Cryogenics (Kelly Dixon) |
215,000 – 215,999 |
Research Services (Mark Averett) |
216,000 – 216,999 |
Tevatron I pbar Source (Chuck Nila) |
217,000 – 217,999 |
SSC Dipoles (Ed Barczak) |
218,000 – 219,999 |
Accelerator Operations Controls (Gus Rehbein) |
220,000 – 221,999 |
Tech. Supt. Engineering Magnet Facility
(L. Sobocki) |
222,000 – 224,999 |
Accel. Dept.–Experimental Support Group
(H. Stredde) |
225,000 – 225,999 |
Technical Support Conventional Magnet
(H. Dixon) |
226,000 – 226,999 |
Technical Support/Engineering (Jerry Davis) |
227,000 – 227,999
(SC#0102) |
Tech. Supt./Tooling
(Roger Bossert & John Carson) |
228,000 – 238,999 |
DØ Central Calor./Brookhaven Design
(Herm Stredde) |
239,000 – 239,999 |
TS/Engineering – SSC Cryostat (Gerry Davis) |
240,000 – 249,999 |
Mechanical Support (Denis Farnum) |
250,000 – 253,999 |
Central Helium Liq. (Mark Mondragon) |
254,000 – 254,999 |
Mech. Supt./Antiproton Source (B. Haring) |
255,000 – 255,999 |
DØ Project (John Morrison) |
256,000 – 256,999 |
Switchyard (D. Breyne) |
257,000 – 258,999 |
Accelerator Cryogenics (D. Richardson) |
259,000 – 259,999 |
Fac. Dept. “Detectors R Us” (B. Kross) |
260,000 – 260,999 |
Main Accelerator (Don Breyne) |
261,000 – 261,999 |
TeV I/ Collider Detector (Don Breyne) |
262,000 – 262,999 |
Tech. Serv./BØ/CDF (D. Wegforth) |
263,000 – 263,999 |
SSC Cryostat (A. Oleck) |
264,000 – 264,999 |
RD/Mechanical Dept. (Vivian Jacobson) |
265,000 – 265,999 |
Loma Linda Medical Accel. (M. Palmer) |
266,000 – 266,999 |
Antiproton Source E/E Support (G. Rehbein) |
267,000 – 268,999 |
KTeV Project (Chuck Nila) |
269,000 – 270,000 |
Data Systems Group (Mike Neumann) |
271,001 – 271,999 |
Ports Tooling (Ed Barczak) |
272,000 – 272,999 |
RD Mechanical (Ed Black) |
273,000 – 273,999 |
DØ (John Morrison ) |
274,000 – 274,999 |
Ind., #2 MF, TSS (Howard Dixon) |
275,000 – 275,999 |
Ind., #2 MF, TSS (Howard Dixon) |
276,000 – 276,999 |
PBar Source Tevatron I (Don Brian) |
277,000 – 277,500 |
E/E Support Group/AD (R. Divelbiss) |
277,501 – 278,500 |
Tech. Support 5B (Ed Barczak) |
278,501 – 279,499 |
DØ/Accelerator Division (Tom Schmitz) |
279,500 – 280,499 |
Accel. Div./Mech. Support (Steve Wesseln) |
280,500 – 281,999 |
Linear Accelerator (Gus Rehbein) |
282,000 – 282,999 |
Booster Accelerator (Gus Rehbein) |
283,000 – 283,999 |
Main Accelerator (Gus Rehbein) |
284,000 – 285,999 |
RD/Mechanical (Frank Carrera) |
286,000 – 287,999 |
DØ Accel Div./EE Support (Gus Rehbein) |
288,000 – 289,999 |
SSC (Gus Rehbein) |
290,000 – 291,000 |
Tech. Support (Bill Robotham) |
291,001 – 291,999 |
Accel. Div./Mech. (Dick Hauser) |
292,000 – 292,999 |
SSC – 50 mm. – Cold Mass – Parts (Howard Fulton) |
293,000 – 293,999 |
SSC – 50 mm. – Cold Mass – Tools (Howard Fulton) |
294,000 – 294,999 |
Tech. Support (Donald E. Arnold) 5/17/90 |
295,000 – 295,999 |
DØ (John Morrison) 7/90 |
296,000 – 296,999 |
Accel. Div./Mech. (Richard Hauser) 9/90 |
297,000 – 297,999 |
CDF (John Rauch) 10/11/90 |
298,000 – 298,999 |
SSC Quality Assurance Traveler/TS Super. Cond. Mag. Fac. |
299,000 – 299,999 |
400 MeV Transport/400 MeV Injection Guirder/(Stewart Mitchell Accel. Mech. Support) 11/90 |
300,000 – 300,999 |
Linac/Accel. Div./Mech. Supp.
(Richard Hauser) 11/21/90 |
301,000 – 301,999 |
SSC – 50 mm. – Cold Mass – Tools
(Howard Fulton) 1/11/91 |
302,000 – 302,999 |
RD/SDC Department (Larry Bartoszek) 1/28/91 |
303,000 – 303,999 |
Physics Department (Angelo Cotta-Ramusino) 3/5/91 |
304,000 – 304,999 |
Magnet Test Facility (Clark Reid) 4/4/91 |
305,000 – 305,999 |
Accelerator Division—Main Injector
(Dick Hauser) |
306,000 – 306,999 |
Moyses Kuchnir (Individual) 4/30/91 |
307,000 – 307,999 |
Tech. Support/MTF Div. 50 (Jim Garvey)
SSC 50mm Power Supply Upgrade
Main Injector Ring Power Supply Upgrade |
308,000 – 308,999 |
Mech. Research Division (Don Carpenter) 9/3/91 |
309,000 – 309,999 |
EE Support – Main Injector (Gus Rehbein) 9/12/91 |
310,000 – 310,999 |
EE Support – Main Injector (Gus Rehbein) 9/12/91 |
311,000 – 311,999 |
Data Acquisition Electronics (Dan Moline)
MS 222, x2738 9/23/91 |
312,000 – 312,999 |
DES Group (Dorothy Van Leesten) 9/23/91 |
313,000 – 313,999 |
SDC (Mike Banas) 1/20/92 |
314,000 – 314,999 |
TS/Design & Drafting (Don Arnold) 4/2/92 |
315,000 – 315,999 |
TS/Drafting (Harry Brown) 4/28/92 |
316,000 – 316,999 |
TS/Lab 2 (Harry Brown) 5/5/92 |
317,000 – 317,999 |
RD/DØ (Jack Mateski) 5/6/92 |
318,000 – 318,999 |
TS/Mag Facility (Howard Dixon) 5/15/92 |
319,000 – 319,999 |
AD/EE Support TESLA Machine
(Gus Rehbein) 7/15/92 |
320,000 – 320,999 |
AD/EE Support TESLA Machine
(Gus Rehbein) 7/15/92 |
321,000 – 321,999 |
CD/Central Computing Facility (Jack MacNerland) 8/14/92 |
322,000 – 322,999 |
Antiproton Source – Cross Gallery (Steve Wesseln) |
323,000 – 323,999 |
Tech Support Eng. – ICB (Gerry Davis) |
324,000 – 324,999 |
CDF/Collider Detector Facility (John Rauch) October 1992 (Prefix 2563) |
325,000 – 325,999 |
SDC/Technical Support (Nancy Bartlett) November 1992 |
326,000-326,999 |
Tevatron (Peggy Crayton) |
327,000-327,999 |
RD Design & Drafting Group Mech. Support (Vivian Villegas) |
328,000-328,999 |
RD Design & Drafting Group Mech. Support (Vivian Villegas) |
329,000-329,999 |
MTF Measurement Group
(Jim Garvey) 9/93 |
330,000-330,999 |
RD/DØ Dept. Electronics Group
(Rick Hance) 12/93 |
331,000-331,999 |
Technical Support
(Andy Oleck and Don Rissman 1/94 |
332,000-332,999 |
CDF/Collider Dtector Facility
(Simmie Meredith) 3/94 |
333,000-333,099 |
Accelerator Division-Main Injector-Eng. Specs. (Dick Hauser) 11/28/94 |
333,100-334,000 |
Technical Support MDF-Main Injector
(Terry Skweres) 12/12/94 |
335,000-335,999 |
Technical Support/Engineering (Jeff Brandt) |
336,000-336,999 |
Technical Support CMS Detector Superconducting Magnet R&D (Rodger Bossert) |
337,000-337,999 |
Accelerator Division/Mechanical Support Main Injector (Peggy Crayton) March 1995 |
338,000-338,999 |
Technical Support
Arnie Knauf
June 1995 |
339,000-339,999 |
CDF Mechanical Support
Hary Carter X2458
Sept. 1995 |
340,000-340,999 |
Accel. Div. Mechanical Support (Electron Cooling)
Peggy Crayton X3058, MS 340 |
341,000-341,999 |
Accelerator Div. Recycler Ring
Gerry Jackson
Sept. 1995 |
342,000-342,999 |
EE Accelerator Div. – Energy Doubler Saver
R. Divelbiss X4046, MS 306
Oct. 1995 |
343,000-343,999 |
Accelerator Div. – Mechanical Support A0
Glenn Waverly X3728, MS 340
November 1995 |
344,000-344,999 |
Technical Support – Design & Drafting
Don Arnold X2871, MS 316
November 1995 |
345,000-345,999 |
Accelerator Division – TESLA
Peggy Crayton X3058, MS 340
November 1995 |
346,000-346,999 |
Accelerator Div. – EE Mechanical
Peggy Crayton X3058, MS 340
November 1995 |
347,000-347,999 |
Tech. Support Section – Low Cost Hadron Collider
Don Arnold X2871, MS 316
March 1996 |
348,000-348,999 |
Accelerator Div. – EE Support for PET Project
Rick Divelbiss, X4046, MS 306
April 1996 |
349,000-349,999 |
Technical Services – ES&H
Nancy Bartlett X2902, MS 316
April 1996 |
350,000-350,999 |
RD Design & Drafting Group, Mechanical Support
Vivian Villegas X4161, MS 219
April 1996 |
351,000-351,999 |
Technical Support Services, FMI
Gerry Davis X3103, MS 316 |
352,000-353,999 |
Tevatron
Rick Divelbiss X4046, MS 306 |
354,000-354,999 |
Linac AC Mechanical Support
Peggy Crayton X3058, MS 340 |
355,000-355,999 |
Technical Support – SDSS
Bob Andree X3703, MS 316 |
356,000-356,999 |
Beams Div. – EE Support(Recycler)
Rick Divelbiss X4046, MS 308 |
357,000-357,999 |
Magnet Facility Equip. (Tech. Div.)
Bob Andree X3703, MS 316 |
358,000-358,999 |
DØ Eng. Particle Physics (DØ Upgrade)
Jack Mateski X2812, MS 357 |
359,000-359,999 |
Beam Division – Mech. Support(M.I. Project)
Peggy Crayton X3058, MS 340 |
360,000-360,999 |
Technical Division- (General)
Bob Andree X3703, MS 316 |
361,000-361,999 |
PPD Mechanical Support(Group K TeV)
Vivian Villegas X4161, MS 219 |
362,000-362,999 |
Technical Division – Pipetron conventional magnet
Bob Andree X3703, MS 316 |
363,000-363,999 |
Beams Division – NuMI – Mechanical Project
Glen Waver X3728, MS 340 |
364,000-364,999 |
Technical Division- LHC high gradient quadrupoles
Simmi Meredeth X4938, MS 316 |
365,000-365,999 |
Beams-Switchyard, experimental beam lines
Peggy Crayton X3058, MS 340 |
366,000-366,999 |
Technical Division – A0 SCRF
Arnie Knauf, x3715, MS 316, 1/21/98 |
367,000-367,999 |
PPD Design and Drafting Group
Vivian Villegas, x4161, MS 219, 3/25/98 |
368,000-368,999 |
Technical Division – CMS Muon Chamber
Bob Andree, x3703, MS 316, 4/15/98 |
369,000-369,999 |
Technical Division – LHC IR Quad Magnet – Tooling & Product
Don Arnold, x2871, MS 316, 5/18/98 |
370,000-370,999 |
NuMI-Beams Division – Electrical Project
Rick Divelbiss, x4046, MS 306, 5/21/98 |
371,000-371,999 |
Technical Division – Specifications
Marianne Battista, x4304, MS 316, 6/3/98 |
372,000-373,999 |
PPD – D0 Upgrade
Jack Mateski, x2812, MS 357, 6/3/98 |
374,000-374,999 |
Beams Division Mech. Support – Main Injector Project
Peggy Crayton, x3058, MS 340, 8/13/98 |
375,000-375,999 |
Beams Division Mech. Support – Pbar
Peggy Crayton, x3058, MS 340, 8/13/98 |
376,000-376,999 |
TD – High Field Magnet
Makarov, x4734, MS 314, 8/13/98 |
377,000-379,999 |
Beams Division – Safety Systems
Rick Divelbiss, x4046, MS 306, 12/16/98 |
380,000-380,999 |
Beams Division – Mini Boone
Rick Divelbiss, x4046, MS 306, 1/21/99 |
381,000-381,999 |
Beams Division – Cryogenic Systems/Beams Cryogenics
David Richardson, x3354, MS 347, 1/21/99 |
382,000-382,999 |
CDF – Mechanical Support
John Rauch, x4963, MS 219, 1/29/99 |
383,000-383,999 |
Beams Division/Muon Collider
Rick Divelbiss, x4046, MS 306, 4/23/99 |
384,000-384,999 |
PPD/Data Supt. Group/PPD Design & Drafting Group
Vivian Villegas, x4161, MS 221, 7/12/99 |
385,000-385,999 |
Beams Division – Electron Cooling
Rick Divelbiss, x4046, MS 306, 9/15/99 |
386,000-386,999 |
PPD/DSG – D0 Mechanical
Vivian Villegas, x4161, MS 219, 11/9/99 |
388,000-388,999 |
TD Engineering and Fabrication – TEV Conventional Magnets
Jeff Brandt, x4732, MS 316, 12/10/99 |
389,000-389,999 |
BD/Mechanical Support/Mini BooNE
Peggy Crayton, x3058, MS 340, 12/14/99 |
390,000-390,999 |
Tech Div/Eng & Fab – LHC IRQ Cryostat
Arnie Knauf, x3715, MS 316, 1/12/00 |
391,000-391,999 |
Beams Division, Mechanical Support – Muon Cooling
Peggy Crayton, x3058, MS 340, 4/3/00 |
392,000-392,999 |
Technical Division – NLC Permanent Magnet
Kerry Ewald, x8058, MS 316, 4/7/00 |
393,000-393,999 |
Technical Division – Common Fasteners
Kerry Ewald, x8058, MS 316, 6/6/00 |
394,000-394,999 |
Beams Division – Booster-Proton Drives
Peggy Crayton, x3058, MS 340, 6/15/00 |
395,000-396,999 |
Beams Division – Technical – Common Fasteners
Kerry Ewald, x8058, MS 316, 6/29/00 |
397,000-397,999 |
PPD/DSG – PPD Mechanical
Vivian Villegas, x4161, MS 219, 7/6/00 |
398,000-398,999 |
Beams Division – Separator Cavity RF
Peggy Crayton, x3058, MS340, e-mail crayton@fnal.gov 8/14/00 |
399,000-399,999 |
PPD/DSG – D0 Mechanical
Vivian Villegas, x4161, MS 219, 8/30/00 |
400,000-400,999 |
TD – CMS Integration
Jeff Brandt, x4732, MS 316, 10/12/00 |
401,000-401,999 |
Beams Division – VLHC (Very Large Hadron Collider)
Rick Divelbiss, x4046, MS 306, divelbiss@fnal.gov 10/17/00 |
402,000-402,999 |
Beams Mechanical Support — Electron Cooling
Peggy Crayton, x3058, MS 340, 10/26/00 |
403,000-403,999 |
PPD/DSG — KAMI
Vivian Villegas, x4161, MS 219, 10/26/00 |
404,000-404,999 |
Tech Div/Eng & Fab — NLC R&D RF Structures
Simmie Meredith, x4938, MS 316, 11/15/00 |
405,000-405,999 |
PPD/DSG – CDF/Mechanical Support
Vivian Villegas, x4161, MS 219, vivianv@fnal.gov, 11/28/00 |
406,000-406,999 |
PPD/Mechanical Dept — NUMI
Chuck Nila, x4311, MS 219, cnila@fnal.gov, 02/02/01 |
407,000-407,999 |
PPD/DSG — BTeV/Mechanical
Vivian Villegas, x4161, MS 219, vivianv@fnal.gov, 02/08/01 |
408,000-408,999 |
Beams Division/Mech. Support — Neutron Therapy Facility
Peggy Crayton, x3058, MS 340, crayton@fnal.gov, 03/22/01 |
409,000-409,999 |
Beams Division — Next Linear Collider
Peggy Crayton, x3058, MS 340, crayton@fnal.gov, 05/03/01 |
410,000-410,999 |
Technical Services — Sloan Digital Sky Survey
Pat Poll, x4028, MS 219, 05/10/01 |
411,000-411,999 |
Technical Division — VLHC/HFM
Bill Christoffersen, x6627, MS 316, 06/25/01 |
412,000-412,999 |
Technical Division — Booster Dipole Magnet
George Zielbauer, x3485, MS 316, 07/27/01 |
413,000-413,999 |
Beams Division Mecahnical Support- Pbar
Peggy Crayton, x3058, MS 316, crayton@fnal.gov 08/14/01 |
414,000-414,999 |
TD/Engineering and Fabrication — Cabling Machine
Luciano Elementi, x6767, MS 314, elementi@fnal.gov 08/22/01 |
415,000-415,999 |
PPD/Mechanical Department — CKM Project
Don Friend, x2029, MS 219, friend@fnal.gov 09/13/01 |
416,000-416,999 |
BD/Mechanical Support — Mini Boone
Peggy Crayton, x3058, MS 340, crayton@fnal.gov 10/15/01 |
417,000-417,999 |
BD/EE Support — Instrumentation
Rick Divelbiss, x4046, MS 306, divelbiss@fnal.gov 11/11/01 |
418,000-418,999 |
Magnet Test Facility
Clark Reid, x2632, MS 344, 1/2/02 |
419,000-419,999 |
BD/EE Support — Electrical Power Distribution System
Rick Divelbiss, x4046, MS 306, divelbiss@fnal.gov 1/7/02 |
420,000-420,999 |
BD/EE Support — NLC-Next Linear Collider
Rick Divelbiss, x4046, MS 306, divelbiss@fnal.gov 2/10/02 |
421,000-421,999 |
PPD/Data Support Group Experiment 907
Vivian Villegas, x4161, MS 122, vivianv@fnal.gov 3/18/02 |
422,000-422,999 |
Beams Div. Mech. Supt. — NUMI
P. Crayton, x3058, MS 340, crayton@fnal.gov 4/22/02 |
423,000-423,999 |
Technical Div. Engineering
Gerald Davis, x3103, MS 316, gadavis@fnal.gov 4/22/02 |
424,000-424,999 |
TD/Engineering & Fabrication — CKM Detector
Jeff Brandt, x4732, MS 316, brandt@fnal.gov 5/16/02 |
425,000-425,999 |
TD/EF/Eng – NLC Girders
Evgueni Borissov, x8904, MS 343, borissov@fnal.gov 5/24/02 |
426,000-426,999 |
TD/Engineering & Fabrication – SCRF 3rd Harmonic Cavity
A. Lee Simmons, x4627, MS 316, simmonsa@fnal.gov 6/19/02 |
427,000-427,999 |
PPD/Mechanical Department – NUMI
Chuck Nila, x4311, MS 219, cnila@fnal.gov 6/26/02 |
428,000-428,999 |
Beams/EE Support – CKM-KAON Seperator Beam
Rick Divelbiss, x4046, MS 308, divelbiss@fnal.gov 6/26/02 |
429,000-429,999 |
TD-Eng & Fab – Tevatron Beam Separator
Don Mitchell, x6768, MS 314, dmitchel@fnal.gov 10/25/02 |
430,000-430,999 |
Technical Division – LHC IR Quad Magnet, Tooling & Product
John Sachtschale, x2822, MS 316, satchel@fnal.gov 02/24/03 |
431,000-431,999 |
PPD/DSG – NUMI
Vivian Villegas, x4161, MS 122, vivian@fnal.gov |
432,000-432,999 |
TD – LHC Integration
Kerry Ewald, x8058, MS 316, ewald@fnal.gov 5/5/03 |
433,000-433,999 |
PPD/DSF – NUMI
Vivian Villegas, x4161, MS 122, vivianv@fnal.gov 6/1/03 |
434,000-434,999 |
PPD/DSG – D0 Mechanical
Vivian Villegas, x4161, MS 122, vivianv@fnal.gov 8/21/03 |
435,000-435,999 |
PPD/DSG – PPD Mechanical
Vivian Villegas, x4161, MS 122, vivianv@fnal.gov 10/06/03 |
436,000-436,999 |
PPD/DSG – DECAM
Vivian Villegas, x4161, MS 122, vivianv@fnal.gov 04/08/04 |
437,000-437,999 |
AD/Mechanical – NUMI
Peggy Crayton, x3058, MS 340, crayton@fnal.gov 04/28/04 |
438,000-438,999 |
Accelerator/EE Support – Proton Driver
Rick Divelbiss, x4046, MS 308, divelbiss@fnal.gov 08/18/04 |
439,000-439,999 |
TD/E&F – BTeV Project
Jeff Brandt, x4732, MS 316, brandt@fnal.gov 09/8/04 |
440,000-440,999 |
TD/E&F – BTeV Project
Jeff Brandt, x4732, MS 316, brandt@fnal.gov 09/8/04 |
441,000-441,999 |
TD/E&F – BTeV Project
Jeff Brandt, x4732, MS 316, brandt@fnal.gov 09/8/04 |
442,000-442,999 |
TD/E&F – BTeV Project
Jeff Brandt, x4732, MS 316, brandt@fnal.gov 09/8/04 |
443,000-443,999 |
TD/Eng & Fab – ILC
Don Mitchell, x6768, MS 314, dmitchel@fnal.gov 11/02/04 |
444,000-444,999 |
PPD/DSG – PPD-Linear Collider
Vivian Villegas, x4161, MS 122, vivianv@fnal.gov 11/02/04 |
445,000-445,999 |
TD/E&F/Conventional Magnets
Jeff Brandt, x4732, MS 316, brandt@fnal.gov 1/03/05 |
446,000-446,999 |
AD/Mechanical – Tevatron
Peggy Crayton, x3058, MS 340, crayton@fnal.gov 5/03/05 |
447,000-447,999 |
AD/Mechanical – 3D Non Master CAD Items
Peggy Crayton, x3058, MS 340, crayton@fnal.gov 3/1/06 |
448,000-448,999 |
AD/Mechanical – Recycler Ring
Peggy Crayton, x3058, MS 340, crayton@fnal.gov 3/14/06 |
449,000-449,999 |
AD/Mechanical – PBar
Peggy Crayton, x3058, MS 340, crayton@fnal.gov 6/6/06 |
450,000-450,999 |
AD/Mechanical – 3D Non Master CAD Items
Peggy Crayton, x3058, MS 340, crayton@fnal.gov 10/09/06 |
451,000-451,999 |
AD/Mechanical – 3D Non Master CAD Items
Peggy Crayton, x3058, MS 340, crayton@fnal.gov 10/09/06 |
452,000-452,999 |
AD/Mechanical – 3D Non Master CAD Items
Peggy Crayton, x3058, MS 340, crayton@fnal.gov 10/09/06 |
453,000-453,999 |
AD/Mechanical – 3D Non Master CAD Items
Peggy Crayton, x3058, MS 340, crayton@fnal.gov 10/09/06 |
454,000-454,999 |
AD/Mechanical – 3D Non Master CAD Items
Peggy Crayton, x3058, MS 340, crayton@fnal.gov 10/09/06 |
455,000-455,999 |
AD/Mechanical – 3D Non Master CAD Items
Peggy Crayton, x3058, MS 340, crayton@fnal.gov 10/09/06 |
456,000-456,999 |
AD/Mechanical – 3D Non Master CAD Items
Peggy Crayton, x3058, MS 340, crayton@fnal.gov 10/09/06 |
457,000-460,999 |
TD/DDCIS – FERMI-TDM Numbers
Jeff Brandt, x4732, MS 343 brandt@fnal.gov 11/29/06 |
461,000-461,999 |
TD/DDCIS – High Field Magnet Project
Jeff Brandt, x4732, MS 343 brandt@fnal.gov 11/29/06 |
462,000-462,999 |
Accelerator/EE Support External Beam Lines
Rick Divelbiss, x4046, MS 306 divelbiss@fnal.gov 12/15/06 |
463,000-463,999 |
AD/Mechanical Main Injector
Peggy Crayton, x3058, MS 340 crayton@fnal.gov 1/8/07 |
464,000-464,999 |
TD/Process Engineering
Jamie Blowers, x2800, MS 314 blowers@fnal.gov 7/27/07 |
465,000-465,999 |
AD-EE Support NOVA
Rick Divelbiss, x4046, MS 306 divelbiss@fnal.gov 9/13/07 |
466,000-466,999 |
PPD/DSG All PPD Mechanical Experiments
Vivian Villegas, x4161, MS 121, vivianv@fnal.gov 10/09/07 |
467,000-467,999 |
TD/DDCIS Muon Collider Project
Jeff Brandt, x4732, MS 340, brandt@fnal.gov 10/25/07 |
468,000-468,999 |
TD/HINS
Evgueni Borissov, x8904, MS 316, borissov@fnal.gov 12/04/08 |
469,000-469,999 |
TD/Drafting & Computer Systems
Simmie L. Meredith, x4938, MS 343, simmielee@fnal.gov 02/02/09 |
470,000-470,999 |
AD/INS Multiwire
Linda Purcell-Taylor, x2502, MS 308, lpurcell@fnal.gov 03/06/09 |
480,000-480,999 |
PPD/MD/D&D DECAM
John Rauch, x4963, MS 219, Jerauch@fnal.gov 05/19/09 |
481,000-481,999 |
TD/SRFDEV FERMI-TDM Numbers
Jeff Brandt, x4732, MS 316, brandt@fnal.gov 07/13/09 |
482,000-482,999 |
TD/SRFDEV FERMI-TDM Numbers
Jeff Brandt, x4732, MS 316, brandt@fnal.gov 07/13/09 |
483,000-483,999 |
TD/SRFDEV FERMI-TDM Numbers
Jeff Brandt, x4732, MS 316, brandt@fnal.gov 07/13/09 |
484,000-484,999 |
TD/SRFDEV FERMI-TDM Numbers
Jeff Brandt, x4732, MS 316, brandt@fnal.gov 07/13/09 |
485,000-485,999 |
TD/Common Hardware
Don Mitchell, x6768, MS 343, dmitchel@fnal.gov 08/17/09 |
486,000-486,999 |
PPD/MD/ All PPD Mechanical Experiments
Don Friend, x2029, MS 219, friend@fnal.gov 05/20/10 |
487,000-487,999 |
AD/ MECHANICAL LONG BASELINE NEUTRINO EXPERIMENT
Peggy Jones, x3058, MS 340, crayton@fnal.gov 06/04/10 |
488,000-488,999 |
AD/ MECHANICAL SUPPORT NUMI
Peggy Jones, x3058, MS 340, crayton@fnal.gov 07/19/10 |
489,000-489,999 |
PPD/MD All PPD Mechanical Experiments
Don Friend, x2029, MS 219, friend@fnal.gov 03/14/11 |
490,000-490,999 |
AD/EE Support Mu2e
Rick Divelbiss, x4046, MS 306 divelbiss@fnal.gov 5/17/11 |
491,000-491,999 |
AD/EE Support Linac Legacy
Rick Divelbiss, x4046, MS 306 divelbiss@fnal.gov6/8/11 |
492,000-492,999 |
TD/Design & Drafting/Long Baseline Neutrino Experiment
Don Mitchell, x6768, MS 343 dmitchel@fnal.gov 9/26/11 |
493,000-493,999 |
PPD/Mechanical Engr Dept
All PPD Mechanical Experiments
Don Friend, x2029, MS 219 friend@fnal.gov 9/20/12 |
494,000-495,999 |
AD/MSD
Fermi-TDM Numbers
Tony Parker, x4476, MS 340 awparker@fnal.gov 11/29/12 |
496,000-496,999 |
AD/MSD
Booster
Tony Parker, x4476, MS 340 awparker@fnal.gov 1/29/13 |
497,000-497,999 |
PPD/Mechanical Engineering Dept
All PPD Mechanical Experiments
Don Friend, x2029, MS 219 friend@fnal.gov
9/5/13 |
498,000-498,999 |
AD
Linear Accelerator
Rick Divelbiss, x4046, MS 306 divelbiss@fnal.gov
8/11/14 |